Plasma screen plant for JBF Group, Ras Al Khaimah
Client
JBF Group
Location
Ras Al Khaimah
Built Up Area
Share
Share on facebook
Share on linkedin
Share on twitter
JBF RAK is a company manufacturing PET bottle grade resins and polyester film, etc., it decided to expand its plasma screen manufacturing operations for television and mobile screen applications. The contract for the air-conditioning system of the new facility was awarded to Johnson Controls as part of a design-and-build project. Johnson Controls engaged Consistent to design the air-conditioning system for the facility, with cleanliness class 10,000 and 100,000 for the manufacturing bay and processing area respectively.
The facility had existing water-cooled chillers to feed the facility. Based on the requirements received from JBF and the equipment manufacturer, Team Consistent developed the detailed design.
Similar Project
Sunteck One World
The proposed project spans across approximately 10 acres and consists of residential development along with clubhouse and retail
Opalz Twin Towers for Danube Properties
Danube is one of the prominent developers in Dubai has launched an innovative concept of having luxury apartments at affordable pricing.
Deira Night Market Village 4
The project is constructed on Plot number / DIA -NM – 0289 at Palm Deira, Dubai. The project is a Night Market and board walk intended to be operated mainly during the nighttime.
Wasl 1 Residential Development at Kifaf
Wasl Properties is one of the leading and largest property management firms in Dubai. It was established by Wasl in October 2008 to manage an extensive real estate portfolio of over 40,000 residential and commercial properties within the Emirate of Dubai. ......
Amity University, Dubai
One of the pioneers in the education field; Amity established its university in Academic City, Dubai. It is one of the largest educational institutes in the Middle East.....
Revier Hotel, Business Bay, Dubai
The lack of operator guidelines during the design stage meant that Team Consistent had to design the project to establish DM and DTCM requirements......